Barge wait times at 28 bunkering ports
How long vessels waited between anchoring and the barge coming alongside, measured by Viking surveyors on 7,929 deliveries from 1 Sep 2025 to 31 Aug 2026.
Map of median waits
| 12-month trend | ||||||
|---|---|---|---|---|---|---|
| Port SaidEgypt | 1.4 h | 6 h | – | 47 | 139 t/h | 3 |
| FujairahUnited Arab Emirates | 1.9 h | 8 h | 808 | 175 t/h | 28 | |
| Port LouisMauritius | 3.1 h | 7 h | – | 59 | 172 t/h | 9 |
| HambantotaSri Lanka | 3.6 h | 14 h | – | 26 | 167 t/h | 6 |
| Khor FakkanUnited Arab Emirates | 4.1 h | 11 h | 190 | 177 t/h | 23 | |
| Corpus ChristiUnited States | 9.5 h | 257 h | – | 51 | 159 t/h | 7 |
| HoustonUnited States | 10 h | 55 h | 137 | 166 t/h | 28 | |
| New YorkUnited States | 10 h | 99 h | 95 | 236 t/h | 17 | |
| DubaiUnited Arab Emirates | 10 h | 17 h | – | 27 | 105 t/h | 13 |
| New OrleansUnited States | 11 h | 100 h | 74 | 143 t/h | 13 | |
| KandlaIndia | 11 h | 19 h | – | 22 | 138 t/h | 7 |
| GalvestonUnited States | 12 h | 36 h | – | 47 | 154 t/h | 13 |
| BolivarUnited States | 13 h | 40 h | 87 | 149 t/h | 22 | |
| GhentBelgium | 14 h | 18 h | – | 34 | 136 t/h | 4 |
| RotterdamNetherlands | 14 h | 24 h | 360 | 145 t/h | 15 | |
| Antwerp-BrugesBelgium | 14 h | 24 h | 244 | 131 t/h | 11 | |
| AmsterdamNetherlands | 16 h | 24 h | 190 | 124 t/h | 9 | |
| Flushing (Vlissingen)Netherlands | 18 h | 36 h | 67 | 146 t/h | 5 | |
| Hong KongChina | 24 h | 54 h | – | 40 | 219 t/h | 10 |
| GibraltarGibraltar | 26 h | 38 h | 419 | 142 t/h | 6 | |
| CeutaSpain | 39 h | 72 h | – | 39 | 144 t/h | 2 |
| IncheonSouth Korea | 42 h | 143 h | 362 | 200 t/h | 9 | |
| SingaporeSingapore | 44 h | 169 h | 4,103 | 195 t/h | 53 | |
| Las PalmasSpain | 46 h | 188 h | 215 | 142 t/h | 9 | |
| Santa Cruz de TenerifeSpain | 48 h | 173 h | 79 | 175 t/h | 3 | |
| VallettaMalta | 50 h | 149 h | – | 52 | 123 t/h | 8 |
| AlgecirasSpain | 55 h | 144 h | 146 | 150 t/h | 4 | |
| PenangMalaysia | 67 h | 142 h | 78 | 176 t/h | 13 |
No ports match that search. Clear the search box or choose All regions.
Also surveyed, with fewer than 20 logged waits so not ranked: Arthur, Cape Town, Cochin, Colombo, Durban, Freeport, Ijmuiden, Istanbul, Le Havre, Lisboa, Lome, Marcus Hook, Mumbai, New Mangalore, Piraeus, Port Arthur, Sikka, Tokyo, Trincomalee.
How we measure
What a wait is
The time from the vessel anchoring to the bunker barge making fast alongside, as recorded on the surveyor’s time sheet. It includes early arrivals ahead of the delivery window, so it reflects what owners actually experience rather than a supplier’s scheduled slot.
Why median and slowest quarter
A few very long waits would distort an average. The median is the typical wait. The slowest quarter figure is the point beyond which one delivery in four waited longer, which is the number to use for a cautious allowance.
What we leave out
Waits over 30 days are treated as entry errors. Ports need 20 logged waits in the period to be ranked. The latest weeks are held back until data entry catches up, so the period ends on 31 Aug 2026.