BunkrIQ

Barge wait times at 28 bunkering ports

How long vessels waited between anchoring and the barge coming alongside, measured by Viking surveyors on 7,929 deliveries from 1 Sep 2025 to 31 Aug 2026.

Shortest median Port Said Busiest port Singapore Updated 27 Nov 2026

Map of median waits

44Singapore 1.9Fujairah 26Gibraltar 42Incheon 14Rotterdam 14Antwerp-Bruges 46Las Palmas 16Amsterdam 4.1Khor Fakkan 55Algeciras 10Houston 10New York 13Bolivar 48Santa Cruz de Tenerife 67Penang 11New Orleans 3.1Port Louis 50Valletta 1.4Port Said 24Hong Kong 39Ceuta 14Ghent 3.6Hambantota 11Kandla
44 median hours, anchored to barge alongside Under 12 h 12–36 h Over 36 h
Barge waiting time by port, 28 ports shown
12-month trend
Port SaidEgypt 1.4 h 6 h – 47 139 t/h 3
FujairahUnited Arab Emirates 1.9 h 8 h 808 175 t/h 28
Port LouisMauritius 3.1 h 7 h – 59 172 t/h 9
HambantotaSri Lanka 3.6 h 14 h – 26 167 t/h 6
Khor FakkanUnited Arab Emirates 4.1 h 11 h 190 177 t/h 23
Corpus ChristiUnited States 9.5 h 257 h – 51 159 t/h 7
HoustonUnited States 10 h 55 h 137 166 t/h 28
New YorkUnited States 10 h 99 h 95 236 t/h 17
DubaiUnited Arab Emirates 10 h 17 h – 27 105 t/h 13
New OrleansUnited States 11 h 100 h 74 143 t/h 13
KandlaIndia 11 h 19 h – 22 138 t/h 7
GalvestonUnited States 12 h 36 h – 47 154 t/h 13
BolivarUnited States 13 h 40 h 87 149 t/h 22
GhentBelgium 14 h 18 h – 34 136 t/h 4
RotterdamNetherlands 14 h 24 h 360 145 t/h 15
Antwerp-BrugesBelgium 14 h 24 h 244 131 t/h 11
AmsterdamNetherlands 16 h 24 h 190 124 t/h 9
Flushing (Vlissingen)Netherlands 18 h 36 h 67 146 t/h 5
Hong KongChina 24 h 54 h – 40 219 t/h 10
GibraltarGibraltar 26 h 38 h 419 142 t/h 6
CeutaSpain 39 h 72 h – 39 144 t/h 2
IncheonSouth Korea 42 h 143 h 362 200 t/h 9
SingaporeSingapore 44 h 169 h 4,103 195 t/h 53
Las PalmasSpain 46 h 188 h 215 142 t/h 9
Santa Cruz de TenerifeSpain 48 h 173 h 79 175 t/h 3
VallettaMalta 50 h 149 h – 52 123 t/h 8
AlgecirasSpain 55 h 144 h 146 150 t/h 4
PenangMalaysia 67 h 142 h 78 176 t/h 13

Also surveyed, with fewer than 20 logged waits so not ranked: Arthur, Cape Town, Cochin, Colombo, Durban, Freeport, Ijmuiden, Istanbul, Le Havre, Lisboa, Lome, Marcus Hook, Mumbai, New Mangalore, Piraeus, Port Arthur, Sikka, Tokyo, Trincomalee.

How we measure

What a wait is

The time from the vessel anchoring to the bunker barge making fast alongside, as recorded on the surveyor’s time sheet. It includes early arrivals ahead of the delivery window, so it reflects what owners actually experience rather than a supplier’s scheduled slot.

Why median and slowest quarter

A few very long waits would distort an average. The median is the typical wait. The slowest quarter figure is the point beyond which one delivery in four waited longer, which is the number to use for a cautious allowance.

What we leave out

Waits over 30 days are treated as entry errors. Ports need 20 logged waits in the period to be ranked. The latest weeks are held back until data entry catches up, so the period ends on 31 Aug 2026.

Want this for your own deliveries?

Clients see waits, quantities and supplier performance for their own stems alongside the port picture, with every survey report on file.