Everllence has secured a contract with the Astilleros Zamakona shipyard in Bilbao, Spain, to provide four 12V175D-MEV variable-speed generator sets for an 86.8-metre live-fish carrier. According to The Maritime Executive, the 5,000-cubic-metre battery-hybrid well-boat was ordered by Norwegian owner Brønnbåt Nord and is scheduled for delivery in 2029.

The vessel design is handled by NSK Ship Design and builds upon Brønnbåt Nord's earlier 2,800-cubic-metre well-boat delivered in 2024. Everllence's delivery scope for the newbuild project also incorporates permanent-magnet alternators designed to enhance overall system efficiency and lower fuel consumption.

The 175D engine series is cleared for operation on biofuels such as FAME and HVO, and is delivered methanol-ready for potential future conversions. Additionally, the engine range features compatibility with alternative fuel pathways and recent developments enabling extended unmanned operational capabilities.